1. <span id="5yl4h"><optgroup id="5yl4h"></optgroup></span>

      <thead id="5yl4h"><nav id="5yl4h"></nav></thead>

      Because of the skin effect of lightning discharge, the lightning current of the steel bar in the outer layer of the building is often several times that of the steel bar inside the building. Generally, the area where the machine room is located spans the external and internal two steel bar areas, so there is a large voltage difference between the steel bar columns in the lightning discharge, which is particularly harmful to precision and valuable equipment, so the voltage equalization band is set to balance the voltage between the steel bar columns. Usually a non-closed equipotential copper strip is laid along the wall of the computer room for one loop, and the material is 30*3mm copper strip, supported by a φ8 insulator. And a group of grounding equipotential voltage equalizing rings are laid under the electrostatic floor of the computer network room, in the shape of a ring or a network structure, and the material is 30*3mm copper strip, supported by a φ8 insulator. The spacing of the insulator connection support point is not more than 1000 mm; mesh size is not more than 1200 mm *1200 mm; voltage-sharing ring is connected to the grid nearby. The connection endpoints are bolted or welded, and the end points connected to the voltage-sharing ring are opposite or diagonal. In the corners of the machine room near the column, install an equipotential busbar with a specification of 100×10mm copper plate and a length of 300mm. After constructing the pillars of the building in each machine room, after welding with the copper bars and the column bars, connected to the busbar; connect all signal shielding trunks in each equipment room to the equipotential busbar or equipotential copper strip. In addition, the power supply PE wire, the equipment housing in the computer room, the frame and other conductive metal objects are connected with the busbar or copper strip nearby, and the connecting wire is 6 mm2 multi-strand copper core wire. If the grounding resistance of the grounding system in computer room is more than 1 ohm, the grounding device should be added around the building.  


      Contact

      400-088-0089

      Online

      Top

      四虎精品成人免费视频| 免费网站看v片在线a| 美女胸被狂揉扒开吃奶二次元| 国产亚洲美女精品久久久| 老司机在线精品| 四虎国产精品免费久久影院| 精品久久人人做人人爽综合| 午夜成人理论福利片| 狠狠躁夜夜躁人人爽天天不卡软件| 免费一级毛片在播放视频| 污污在线免费观看| 亚洲码欧美码一区二区三区| 欧美一级欧美三级在线观看| 亚洲午夜精品一区二区| 日韩片在线观看| 久久天天躁狠狠躁夜夜不卡| 成人看的一级毛片| 一级网站在线观看| 在线观看免费精品国产| 99re这里只有精品6| 国产激情视频在线播放| 蜜桃97爱成人| 四虎永久在线精品国产免费| 男人的天堂一区二区视频在线观看| 人妻熟妇乱又伦精品视频 | 国产一区二区视频在线观看| 精品久久亚洲一级α| 免费a级毛片无码av| 欧美在线观看网址| 亚洲av日韩av欧v在线天堂| 无翼乌全彩无遮挡之老师| 中文字幕国产综合| 在线播放日本爽快片| 69av视频在线观看| 国产又大又硬又粗| 精品久久久久久无码中文字幕一区 | 国产欧美久久一区二区三区| 色婷婷综合久久久久中文一区二区| 啊哈~在加了一根手指| 波多野结衣上班| 亚洲国产亚洲综合在线尤物|